I25 NB TO I70 RAMP over GLOBEVILLE ROAD
IN DENVER · County 031, Colorado · Built 1996 · 3 Lanes · 125,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
39.772011, -104.989722
This bridge is in worse condition than 26.5% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 30 years old.
Nearby Bridges
RAMP TO I 25 SBND over RAMP TO PARK AVE R
Built 1996
44TH AVE over I 25 ML
Built 1988
I70 NB RMP .75 MI. over GLOBEVILLE RMP-NB I25
Built 1994
I 25 ML over FOX STREET
Built 1949
RAMP TO PARK AVE over I 25 ML RAMPS R
Built 1998
RAMP TO PARK AV R over RAMP TO 38TH STREET R
Built 1996
31ST ST over SOUTH PLATTE RIVER
Built 1974
RAMP TO I 70 EBND over I 25 ML RAMPS R
Built 1993
I 25 ML over RR SPUR
Built 1949
RMP I70EB TO I25NB over I 25 ML I 70 ML RAMPS R
Built 1992
Bridge Details
- Structure #
- E-16-PK
- Year Built
- 1996
- Length
- 136.2 m (446.9 ft)
- Max Span
- 136.2 m
- Width
- 16.8 m (55.1 ft)
- Lanes
- 3
- Daily Traffic
- 125,500
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $884,000
- Total Project Cost
- $1,325,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.