RAMP TO I 25 SBND over RAMP TO PARK AVE R
IN DENVER · County 031, Colorado · Built 1996 · 3 Lanes · 125,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
39.773606, -104.990317
This bridge is in worse condition than 87.5% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 30 years old.
Nearby Bridges
I25 NB TO I70 RAMP over GLOBEVILLE ROAD
Built 1996
44TH AVE over I 25 ML
Built 1988
RAMP TO I 70 EBND over I 25 ML RAMPS R
Built 1993
I70 NB RMP .75 MI. over GLOBEVILLE RMP-NB I25
Built 1994
I 25 ML over FOX STREET
Built 1949
RAMP TO I 70 EBND over RAMP TO I 25 SBND R
Built 1993
RMP I70EB TO I25NB over I 25 ML I 70 ML RAMPS R
Built 1992
I 25 ML HOV LANES over RAMPS TO I 25/ I 70
Built 1989
I 70 ML WBND over I 25 ML AND RAMPS
Built 1991
RMP/I25NB TO I70WB over RAMP TO I-25 SBND R
Built 1993
Bridge Details
- Structure #
- E-16-OR
- Year Built
- 1996
- Length
- 34 m (111.5 ft)
- Max Span
- 32.1 m
- Width
- 20.6 m (67.6 ft)
- Lanes
- 3
- Daily Traffic
- 125,500
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.