I 25 ML over STORM DRAINAGE

0.1 MI. N. OF 20TH ST. · County 031, Colorado · Built 1993 · 14 Lanes · 242,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
E-16-PI
Year Built
1993
Length
17.7 m (58.1 ft)
Max Span
5.5 m
Width
87.8 m (288.1 ft)
Lanes
14
Daily Traffic
242,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.