20TH STREET over I 25 ML

20TH STREET OVER I25 · County 031, Colorado · Built 1994 · 4 Lanes · 16,565 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
E-16-OO
Year Built
1994
Length
85.5 m (280.5 ft)
Max Span
43.2 m
Width
25.1 m (82.3 ft)
Lanes
4
Daily Traffic
16,565
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.