SH 121 ML over CLEAR CREEK

S. edge 70 76 ramp 121 · County 059, Colorado · Built 1941 · 5 Lanes · 38,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
E-16-O
Year Built
1941
Reconstructed
1980
Length
47.8 m (156.8 ft)
Max Span
16.1 m
Width
37.5 m (123 ft)
Lanes
5
Daily Traffic
38,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.