I 70 ML EBND over CLEAR CREEK

0.4 MI EAST OF JCT. SH 12 · County 059, Colorado · Built 1967 · 3 Lanes · 46,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-16-GS
Year Built
1967
Reconstructed
1988
Length
79.3 m (260.2 ft)
Max Span
15.7 m
Width
20 m (65.6 ft)
Lanes
3
Daily Traffic
46,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.