I 70 FRONTAGE over W FORK CLEAR CREEK SR

3.5 MI NE OF GEORGETOWN · County 019, Colorado · Built 2000 · 2 Lanes · 668 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
E-14-BH
Year Built
2000
Length
24.3 m (79.7 ft)
Max Span
23.2 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
668
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.