SILVER LAKE DRIVE over CLEAR CREEK
AT FRONTAGE ROAD · County 019, Colorado · Built 1980 · 2 Lanes · 250 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
39.765575, -105.626483
This bridge is in worse condition than 71.4% of bridges in County 019. The average bridge in Colorado is 0 years old; this one is 46 years old.
Nearby Bridges
I 70 ML over RAMP TO I 70 ML
Built 1965
ALVARADO ROAD over CLEAR CREEK
Built 2010
I 70 ML over COUNTY ROAD
Built 1965
SERVICE ROAD over MILL CREEK SR
Built 1934
I 70 ML over CLEAR CREEK
Built 1965
I 70 ML WBND over COUNTY ROAD
Built 1965
I 70 ML EBND over COUNTY ROAD
Built 1965
US 40 ML over I 70 ML CLEAR CREEK
Built 1965
COUNTY ROAD 306 over I 70 ML CLEAR CREEK
Built 1965
I 70 FRONTAGE over W FORK CLEAR CREEK SR
Built 2000
Bridge Details
- Structure #
- CLRSLR-0.02
- Year Built
- 1980
- Length
- 15.2 m (49.9 ft)
- Max Span
- 14.3 m
- Width
- 7.1 m (23.3 ft)
- Lanes
- 2
- Daily Traffic
- 250
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.