N SPRING GULCH RD over CLEAR CREEK AR

3.7 MI EAST OF JCT US 40 · County 019, Colorado · Built 1965 · 1 Lanes · 33 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
E-14-BA
Year Built
1965
Length
28.7 m (94.2 ft)
Max Span
9.4 m
Width
5.8 m (19 ft)
Lanes
1
Daily Traffic
33
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$88,000
Total Project Cost
$97,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.