SERVICE ROAD over CLEAR CREEK SR

3.2 MI E OF JCT US 40 · County 019, Colorado · Built 1965 · 2 Lanes · 657 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
E-14-AW
Year Built
1965
Length
30.5 m (100.1 ft)
Max Span
11.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
657
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.