SW 4/5TH LEVEL PAR over 84TH AVENUE
BTWN SW GARAGES · County 031, Colorado · Built 2007 · 2 Lanes · 348 vehicles/day
Overall
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
39.848053, -104.675669
This bridge is in worse condition than 55.6% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 19 years old.
Nearby Bridges
LEVEL 4 SW TERMINA over 84TH AVENUE
Built 2014
LEVEL 5 SW TERMINA over 84TH AVENUE
Built 2014
LEVEL 6 SW TERMINA over 84TH AVENUE
Built 2014
SW 2ND LEVEL NEW over PARKING LOT
Built 2007
SW 2ND LEVEL PARKI over FUTURE PARKING LOT
Built 1993
SW 2ND LEVEL ENTRA over 84TH AVENUE
Built 1993
LEVEL 5 NW TERMINA over TERRAIN
Built 1993
W 2ND LEVEL PARKIN over PARKING LOT
Built 1993
LEVEL 5 SE TERMINA over 84TH AVENUE
Built 2014
LEVEL 4 SE TERMINA over 84TH AVENUE
Built 2014
Bridge Details
- Structure #
- D-31-PB-902
- Year Built
- 2007
- Length
- 38.2 m (125.3 ft)
- Max Span
- 17.6 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 348
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.