COMMERCIAL VEHICLE over RTD COMMUTER RAIL
S OF TERMINAL BLDG · County 031, Colorado · Built 2017 · 1 Lanes · 1,749 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
39.843139, -104.673942
This bridge is in worse condition than 26.5% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 9 years old.
Nearby Bridges
SCOTTSBURG ROAD over THIRD CREEK TRIBUTARY
Built 1992
QUEENSBURG ROAD over SCOTTSBURG ROAD | RTD CO
Built 1992
HAUL ROAD over SCOTTSBURG ROAD | RTD CO
Built 2010
SCOTTSBURG ROAD over RTD COMMUTER RAIL | PENA
Built 2017
PENA BOULEVARD over HAUL ROAD
Built 2010
LEVEL 6 SE TERMINA over 84TH AVENUE
Built 2014
LEVEL 6 SW TERMINA over 84TH AVENUE
Built 2014
LEVEL 5 SW TERMINA over 84TH AVENUE
Built 2014
LEVEL 5 SE TERMINA over 84TH AVENUE
Built 2014
LEVEL 4 SE TERMINA over 84TH AVENUE
Built 2014
Bridge Details
- Structure #
- D-31-PB-670
- Year Built
- 2017
- Length
- 34.3 m (112.5 ft)
- Max Span
- 32.7 m
- Width
- 11.7 m (38.4 ft)
- Lanes
- 1
- Daily Traffic
- 1,749
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.