RAMP TO I 76 EBND over I 76 ML R

4.6 MI E OF JCT SH 144 · County 087, Colorado · Built 1993 · 1 Lanes · 3,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
D-20-AT
Year Built
1993
Length
139.7 m (458.3 ft)
Max Span
48.8 m
Width
9.3 m (30.5 ft)
Lanes
1
Daily Traffic
3,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.