COUNTY ROAD 4 over I 76 ML
NEAR WIGGINS · County 087, Colorado · Built 1959 · 2 Lanes · 459 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.238425, -104.074667
This bridge is in worse condition than 39.9% of bridges in County 087. The average bridge in Colorado is 0 years old; this one is 67 years old.
Nearby Bridges
US 34 ML over KIOWA CREEK
Built 1999
I 76 ML WBND over KIOWA CREEK
Built 1993
I 76 ML EBND over KIOWA CREEK
Built 1993
CENTRAL AVE over KIOWA CREEK
Built 2005
US 6 ML over I 76 ML
Built 1959
SH 39 ML over I 76 ML
Built 1959
US 34 ML over SH 39 ML
Built 1982
RAMP TO I 76 EBND over I 76 ML R
Built 1993
County Road P over Kiowa Creek
Built 1971
I 76 ML EBND over BIJOU CREEK
Built 1966
Bridge Details
- Structure #
- D-20-AG
- Year Built
- 1959
- Length
- 80.8 m (265.1 ft)
- Max Span
- 23.2 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 459
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.