BELLEVIEW AVE over GOLDSMITH GULCH
JUST E OF DTC BLVD · County 005, Colorado · Built 1986 · 8 Lanes · 20,376 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 8 | Very Good |
Location
39.624097, -104.88905
This bridge is in worse condition than 75.8% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 40 years old.
Nearby Bridges
PRENTICE STREET over GOLDSMITH GULCH
Built 1992
YOSEMITE STREET over GOLDSMITH GULCH
Built 1992
I 25 ML over SH 88 ML W./BELLEVIEW
Built 1958
RAMP TO TAMARAC over I 225 ML NBND R
Built 1976
I 225 ML NBND over TAMARAC PARKWAY
Built 1975
I 225 ML SBND over TAMARAC PARKWAY
Built 1975
I 225 ML over GOLDSMITH GULCH
Built 1971
E UNION AVE EB over RTD TRACKS | BELLEVIEW A
Built 1992
E UNION AVENUE WB over RTD TRACKS | BELLEVIEW A
Built 1992
NB I-25 RAMP over I225 ML
Built 2005
Bridge Details
- Structure #
- D-11-GG-200
- Year Built
- 1986
- Length
- 19.4 m (63.6 ft)
- Max Span
- 18.2 m
- Width
- 39.1 m (128.3 ft)
- Lanes
- 8
- Daily Traffic
- 20,376
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $618,000
- Total Project Cost
- $679,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.