EB 6TH AVENUE over SEMINOLE ST | MARIPOSA S
0.35 MI E of I-25 · County 031, Colorado · Built 1965 · 4 Lanes · 31,795 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.725625, -105.003586
This bridge is in worse condition than 55.6% of bridges in County 031. The average bridge in Colorado is 0 years old; this one is 61 years old.
Nearby Bridges
WB 6TH AVE over BNF RR | RTD | MARIPOSA
Built 1958
WB 6TH AVE over SEMINOLE ROAD
Built 1958
ON RAMP TO EB 6TH over OFF-RAMP FROM EB 6TH AVE
Built 2002
8TH AVENUE over BNSF RR | NAVAJO ST | OS
Built 1985
I 25 (RMP B) over RR SPUR
Built 2014
I 25 ML over RR SPUR
Built 1958
US 6 ML over BNSF RR and US 6 RAMP
Built 2014
RAMP TO I 25 ML over BNSF RR R
Built 1988
EB6 RMP. TO I25 SB over RAMP TO I 25 SBND R
Built 1987
RAMP TO I 25 NBND over US 6 ML
Built 1989
Bridge Details
- Structure #
- D-03-V-161
- Year Built
- 1965
- Length
- 435.9 m (1430.1 ft)
- Max Span
- 27.4 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 4
- Daily Traffic
- 31,795
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $8,377,000
- Total Project Cost
- $9,214,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.