MURRAY BOULEVARD over WEST FORK SAND CREEK

.35 S OF PALMER PARK BLVD · County 041, Colorado · Built 1993 · 4 Lanes · 10,930 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
CSG-K.46-09.92A
Year Built
1993
Length
20.2 m (66.3 ft)
Max Span
18.1 m
Width
24.4 m (80.1 ft)
Lanes
4
Daily Traffic
10,930
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.