PALMER PARK BLVD over WEST FORK SAND CREEK

0.25 MI E OF ACADEMY BLVD · County 041, Colorado · Built 1999 · 4 Lanes · 9,784 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
CSG-K.26-10.08A
Year Built
1999
Length
19.1 m (62.7 ft)
Max Span
17.5 m
Width
24.6 m (80.7 ft)
Lanes
4
Daily Traffic
9,784
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.