FILLMORE STREET over MONUMENT CREEK | PIKES P

0.15 MI E OF I25 · County 041, Colorado · Built 1961 · 5 Lanes · 32,155 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
CSG-G.14-11.58
Year Built
1961
Reconstructed
1971
Length
87.9 m (288.4 ft)
Max Span
23.3 m
Width
22.7 m (74.5 ft)
Lanes
5
Daily Traffic
32,155
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.