FILLMORE STREET over UP RR

0.1 MI E OF I-25 · County 041, Colorado · Built 1961 · 5 Lanes · 34,925 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
CSG-F.98-11.59
Year Built
1961
Reconstructed
1971
Length
37.5 m (123 ft)
Max Span
13.3 m
Width
22.7 m (74.5 ft)
Lanes
5
Daily Traffic
34,925
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.