COUNTY LANE 8 over COLORADO CANAL
.1 MI N OF ROAD E · County 025, Colorado · Built 1990 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
38.185758, -103.931603
This bridge is in worse condition than 25.9% of bridges in County 025. The average bridge in Colorado is 0 years old; this one is 36 years old.
Nearby Bridges
COUNTY LANE 7 over COLORADO CANAL
Built 1995
COUNTY LANE 10 over DAYTON LATERAL
Built 1991
COUNTY LANE 10 over COLORADO CANAL
Built 1991
COUNTY ROAD H.5 over COLORADO CANAL
Built 1995
US 50 ML WBND over OTERO CANAL
Built 1998
US 50 ML EBND over OTERO CANAL
Built 1957
US 50 ML EBND over APISHAPA RIVER
Built 1957
US 50 ML WBND over APISHAPA RIVER
Built 1997
COUNTY LANE 12 over BOB CREEK
Built 1994
US 50 ML over OTERO CANAL
Built 1947
Bridge Details
- Structure #
- CRCO 1.10-13A
- Year Built
- 1990
- Length
- 21.6 m (70.9 ft)
- Max Span
- 21.1 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.