US 50 ML over OTERO CANAL

3.4 MI EAST OF FOWLER · County 089, Colorado · Built 1947 · 2 Lanes · 4,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L-21-A
Year Built
1947
Length
8.1 m (26.6 ft)
Max Span
7.3 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
4,700
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.