I25 EAST FRONTAGE over HILLSBORO TRIBUTARY
0.5 MI S OF SH 402 · County 069, Colorado · Built 2023 · 2 Lanes · 2,023 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
40.371819, -104.98945
This bridge is in worse condition than 33.6% of bridges in County 069. The average bridge in Colorado is 0 years old; this one is 3 years old.
Nearby Bridges
I 25 ML over HILLSBORO TRIBUTARY
Built 2020
SH 402 ML over I25 ML
Built 2020
I 25 ML NBND over COUNTY ROAD 16
Built 2022
I 25 ML SBND over COUNTY ROAD 16
Built 2023
I 25 ML SBND over SH 60 ML
Built 2022
I 25 ML NBND over SH 60 ML
Built 2023
I 25 ML SBND over BIG THOMPSON RIVER
Built 2022
I 25 ML NBND over BIG THOMPSON RIVER
Built 2021
I 25 SERVICE RD over BIG THOMPSON RIVER SR
Built 2020
COUNTY ROAD 20E over I 25 ML
Built 2021
Bridge Details
- Structure #
- C-17-HE
- Year Built
- 2023
- Length
- 29.3 m (96.1 ft)
- Max Span
- 28.3 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 2,023
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.