I25 EAST FRONTAGE over HILLSBORO TRIBUTARY

0.5 MI S OF SH 402 · County 069, Colorado · Built 2023 · 2 Lanes · 2,023 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
C-17-HE
Year Built
2023
Length
29.3 m (96.1 ft)
Max Span
28.3 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
2,023
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.