SH 13 ML over PINE RIDGE GULCH

SW EDGE OF CRAIG · County 081, Colorado · Built 1973 · 5 Lanes · 2,800 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
C-06-P
Year Built
1973
Length
13.3 m (43.6 ft)
Max Span
4.9 m
Width
32.6 m (107 ft)
Lanes
5
Daily Traffic
2,800
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.