SH 394 ML over YAMPA RIVER

1 M SO OF CRAIG · County 081, Colorado · Built 1985 · 2 Lanes · 3,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B-06-V
Year Built
1985
Length
77.1 m (253 ft)
Max Span
37.8 m
Width
15.6 m (51.2 ft)
Lanes
2
Daily Traffic
3,100
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.