N. 75th St (Cr 25) over Boulder Creek

0.1 Mi S of Jay Road · County 013, Colorado · Built 1978 · 2 Lanes · 8,907 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
BC-25-10.8-BO
Year Built
1978
Length
34.1 m (111.9 ft)
Max Span
16.2 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
8,907
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.