SH 52 ML over WHITE ROCK BOULDER DITCH
NIWOT AT 79th ST INT · County 013, Colorado · Built 1965 · 3 Lanes · 8,900 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
40.087081, -105.169408
This bridge is in worse condition than 57.9% of bridges in County 013. The average bridge in Colorado is 0 years old; this one is 61 years old.
Nearby Bridges
Monarch Road over Dry Creek
Built 2019
Niwot Road (CR 34) over Dry Creek
Built 1985
Niwot Meadow Farm over Dry Creek No 2
Built 2005
Lookout Road over Whiterock Ditch
Built 1996
SH 119 NBND over DRY CREEK
Built 1959
Lookout Road over Boulder Cr. Supply Ditch
Built 1996
County Road 33 over Left Hand Creek
Built 1980
N 81st St (CR 31) over Left Hand Creek
Built 1992
County Road 26 over Left Hand Creek
Built 1991
N 63rd St (CR 39) over Lefthand Creek
Built 2011
Bridge Details
- Structure #
- D-16-Y
- Year Built
- 1965
- Length
- 7.8 m (25.6 ft)
- Max Span
- 7.8 m
- Width
- 32.8 m (107.6 ft)
- Lanes
- 3
- Daily Traffic
- 8,900
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.