INDEPENDENCE TRAIL over BEAR CREEK | MEADOW DRIV
S OF HWY 74 · County 059, Colorado · Built 1930 · 2 Lanes · 407 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
39.635989, -105.314447
This bridge is in worse condition than 78.6% of bridges in County 059. The average bridge in Colorado is 0 years old; this one is 96 years old.
Nearby Bridges
SH 74 ML over BEAR CREEK
Built 1959
SH 74 ML over BEAR CREEK
Built 1959
FOREST HILL ROAD over BEAR CREEK
Built 1975
COUNTY ROAD 73 over BEAR CREEK
Built 2003
COUNTY ROAD 73 over CUB CREEK
Built 2000
SILVER SPRUCE LANE over LITTLE CUB CREEK
Built 1974
UPPER BEAR CREEK R over BEAR CREEK
Built 2020
DEDISSE PARK RD over BEAR CREEK TRIB
Built 1970
BUFFALO PARK ROAD over CUB CREEK
Built 1979
GOLF COURSE RD over BEAR CREEK
Built 2016
Bridge Details
- Structure #
- B-18-19
- Year Built
- 1930
- Length
- 9.6 m (31.5 ft)
- Max Span
- 9.3 m
- Width
- 6.6 m (21.7 ft)
- Lanes
- 2
- Daily Traffic
- 407
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $136,000
- Total Project Cost
- $150,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.