INDEPENDENCE TRAIL over BEAR CREEK | MEADOW DRIV

S OF HWY 74 · County 059, Colorado · Built 1930 · 2 Lanes · 407 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B-18-19
Year Built
1930
Length
9.6 m (31.5 ft)
Max Span
9.3 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
407
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$136,000
Total Project Cost
$150,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.