COUNTY ROAD 73 over BEAR CREEK

AT JCT W/ HWY 74 · County 059, Colorado · Built 2003 · 5 Lanes · 15,760 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B-18-16A
Year Built
2003
Length
13.4 m (44 ft)
Max Span
12.2 m
Width
32.9 m (107.9 ft)
Lanes
5
Daily Traffic
15,760
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.