STEPHEN D HOGAN PK over SAND CREEK
0.2 MI E OF SH30 · County 005, Colorado · Built 2019 · 2 Lanes · 7,470 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.725206, -104.753658
This bridge is in worse condition than 31.1% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 7 years old.
Nearby Bridges
I 70 ML EBND over US 40 WBND
Built 1957
TOWER ROAD over LOCAL DRAINAGE
Built 1981
6th Parkway over E-470
Built 1997
US 40 ML EBND over SAND CREEK
Built 2013
US 40 ML WBND over SAND CREEK
Built 2013
E-470 over Coal Creek Tributary
Built 1997
ASPEN STREET over EAST TOLLGATE CREEK
Built 1999
E-470 SB over Coal Creek
Built 1997
E-470 NB over Coal Creek
Built 1997
I 70 ML EBND over SMITH ROAD UP RR
Built 2014
Bridge Details
- Structure #
- AUR07.0-Q.2
- Year Built
- 2019
- Length
- 208.8 m (685 ft)
- Max Span
- 42.7 m
- Width
- 20.4 m (66.9 ft)
- Lanes
- 2
- Daily Traffic
- 7,470
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.