E-470 NB over Coal Creek

18.44 MI FROM I25 · County 005, Colorado · Built 1997 · 3 Lanes · 19,715 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
E-470-18.44A
Year Built
1997
Reconstructed
2020
Length
119.6 m (392.4 ft)
Max Span
38.2 m
Width
22.6 m (74.1 ft)
Lanes
3
Daily Traffic
19,715
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.