U.S. ROUTE 34 over FALL RIVER

2.0 MILES WEST OF FALL RI · County 069, Colorado · Built 1983 · 2 Lanes · 3,310 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
1520005P0000000
Year Built
1983
Length
8.5 m (27.9 ft)
Max Span
7.9 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
3,310
Material
Prestressed Concrete
Design
Tee Beam
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$32,000
Total Project Cost
$48,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.