David Drive over Fall River

80 Feet West of US Hwy 34 · County 069, Colorado · Built 1974 · 2 Lanes · 221 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
EP-DAVIDDR-FALL
Year Built
1974
Reconstructed
1997
Length
10.1 m (33.1 ft)
Max Span
8.9 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
221
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.