STATE ROUTE 98 over EAST HIGHLINE CANAL
11-IMP-098-45.51 · County 025, California · Built 2006 · 2 Lanes · 2,850 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.697681, -115.283211
This bridge is in worse condition than 15.5% of bridges in County 025. The average bridge in California is 0 years old; this one is 20 years old.
Nearby Bridges
STATE ROUTE 98 over EAST HIGHLINE CANAL #2
Built 1938
VERDE SCHOOL RD over EAST HIGHLINE CANAL
Built 1940
STATE ROUTE 98 over HEMLOCK MAIN CANAL
Built 1939
INTERSTATE 8 EB over HOLDRIDGE EAST HIGHLINE
Built 1971
INTERSTATE 8 WB over HOLDRIDGE EAST HIGHLINE
Built 1971
EVAN HEWES HIGHWAY over EAST HIGHLINE CANAL
Built 1949
STATE ROUTE 115 over INTERSTATE 8
Built 1971
STATE ROUTE 98 over ALAMO RIVER
Built 1977
MILLER ROAD over INTERSTATE 8
Built 1971
KEFFER RD over ALAMO RIVER
Built 1965
Bridge Details
- Structure #
- 58 0343
- Year Built
- 2006
- Length
- 46 m (150.9 ft)
- Max Span
- 12.2 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 2,850
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.