SR 7 AUTO TRAFFIC over SR 7 TRUCK TRAFFIC

11-IMP-007-S0.43 · County 025, California · Built 1996 · 3 Lanes · 9,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
58 0328
Year Built
1996
Length
65.8 m (215.9 ft)
Max Span
35 m
Width
21.2 m (69.6 ft)
Lanes
3
Daily Traffic
9,400
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.