BORDER CROSSING (C over ALL AMERICAN CANAL
1.9 MILES SOUTH OF CA-98 · County 025, California · Built 1996 · 9 Lanes · 16,700 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.673406, -115.387964
This bridge is in worse condition than 64.3% of bridges in County 025. The average bridge in California is 0 years old; this one is 30 years old.
Nearby Bridges
SR 7 AUTO TRAFFIC over SOUTH ALAMO CANAL
Built 1996
SR 7 AUTO TRAFFIC over SR 7 TRUCK TRAFFIC
Built 1996
CARR RD over ASH CANAL
Built 1940
STATE ROUTE 98 over EAST ASH CANAL
Built 1938
STATE ROUTE 98 over ALAMO RIVER
Built 1977
STATE ROUTE 98 over ASH MAIN CANAL
Built 1939
STATE ROUTE 98 over HEMLOCK MAIN CANAL
Built 1939
JASPER RD over ASH CANAL
Built 1975
KEFFER RD over ALAMO RIVER
Built 1965
COLE RD over CENTRAL MAIN CANAL
Built 1971
Bridge Details
- Structure #
- 2195003P0000000
- Year Built
- 1996
- Length
- 64.7 m (212.3 ft)
- Max Span
- 52.4 m
- Width
- 66.1 m (216.9 ft)
- Lanes
- 9
- Daily Traffic
- 16,700
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $230,000
- Total Project Cost
- $345,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.