MISSION RD over SAN MARCOS CREEK TRIB

750 FT W/O LAS POSAS RD · County 073, California · Built 1982 · 5 Lanes · 20,160 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
57C0777
Year Built
1982
Length
7.6 m (24.9 ft)
Max Span
2.4 m
Width
25.6 m (84 ft)
Lanes
5
Daily Traffic
20,160
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.