SAN MARCOS BLVD over SAN MARCOS CREEK TRIB

AT PACIFIC ST INTERSECTON · County 073, California · Built 1986 · 5 Lanes · 37,700 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
57C0301
Year Built
1986
Length
16.8 m (55.1 ft)
Max Span
3.7 m
Lanes
5
Daily Traffic
37,700
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.