CANNON ROAD over AGUA HEDIONDA CHANNEL
100 FT S/O EL CAMINO REAL · County 073, California · Built 2002 · 6 Lanes · 11,075 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
33.148667, -117.297839
This bridge is in worse condition than 65.2% of bridges in County 073. The average bridge in California is 0 years old; this one is 24 years old.
Nearby Bridges
EL CAMINO REAL over AGUA HEDIONDA CREEK
Built 1971
CANNON ROAD W/B over MACARIO CANYON
Built 2003
CANNON ROAD E/B over MACARIO CANYON
Built 2003
INTERSTATE 5 over CANNON ROAD
Built 1971
INTERSTATE 5 over AGUA HEDIONDA LAGOON
Built 1953
COLLEGE BLVD over BUENA VISTA CREEK
Built 1985
CHINQUAPIN AVE over INTERSTATE 5
Built 1970
TAMARACK AVENUE over INTERSTATE 5
Built 1971
PALOMAR AIRPORT RD over INTERSTATE 5
Built 1966
THUNDER DRIVE over BUENA VISTA CREEK
Built 1973
Bridge Details
- Structure #
- 57C0762
- Year Built
- 2002
- Length
- 40.8 m (133.9 ft)
- Max Span
- 14.6 m
- Width
- 29 m (95.1 ft)
- Lanes
- 6
- Daily Traffic
- 11,075
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.