EL CAMINO REAL over AGUA HEDIONDA CREEK
80FT S/O CANNON RD · County 073, California · Built 1971 · 8 Lanes · 32,597 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
33.148611, -117.294983
This bridge is in worse condition than 65.2% of bridges in County 073. The average bridge in California is 0 years old; this one is 55 years old.
Nearby Bridges
CANNON ROAD over AGUA HEDIONDA CHANNEL
Built 2002
CANNON ROAD W/B over MACARIO CANYON
Built 2003
CANNON ROAD E/B over MACARIO CANYON
Built 2003
COLLEGE BLVD over BUENA VISTA CREEK
Built 1985
INTERSTATE 5 over CANNON ROAD
Built 1971
INTERSTATE 5 over AGUA HEDIONDA LAGOON
Built 1953
THUNDER DRIVE over BUENA VISTA CREEK
Built 1973
CHINQUAPIN AVE over INTERSTATE 5
Built 1970
STATE ROUTE 78 over COLLEGE BLVD
Built 1967
TAMARACK AVENUE over INTERSTATE 5
Built 1971
Bridge Details
- Structure #
- 57C0191
- Year Built
- 1971
- Reconstructed
- 2022
- Length
- 34.4 m (112.9 ft)
- Max Span
- 11.3 m
- Width
- 34.7 m (113.8 ft)
- Lanes
- 8
- Daily Traffic
- 32,597
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.