EL CAMINO REAL over AGUA HEDIONDA CREEK

80FT S/O CANNON RD · County 073, California · Built 1971 · 8 Lanes · 32,597 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
57C0191
Year Built
1971
Reconstructed
2022
Length
34.4 m (112.9 ft)
Max Span
11.3 m
Width
34.7 m (113.8 ft)
Lanes
8
Daily Traffic
32,597
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.