COLLIER WAY over HARBISON CANYON CREEK
25 FT S/O HARBISON CYN RD · County 073, California · Built 2007 · 2 Lanes · 117 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
32.815025, -116.836189
This bridge is in worse condition than 65.2% of bridges in County 073. The average bridge in California is 0 years old; this one is 19 years old.
Nearby Bridges
WARFIELD WAY over HARBISON CYN CREEK
Built 1972
NOAKES ST over HARBISON CYN CREEK
Built 1944
PATRICK DRIVE over HARBISON CREEK
Built 2003
DEHESA RD over NORTH FORK SWEETWATER RI
Built 1989
INTERSTATE 8 EB over FLINN SPRINGS RD
Built 1965
SOLDIN LANE over LOS COCHES CREEK
Built 2009
INTERSTATE 8 WB over PEUTZ VALLEY RD
Built 1969
INTERSTATE 8 WB over FLINN SPRINGS RD
Built 1965
INTERSTATE 8 EB over PEUTZ VALLEY RD
Built 1969
SLOANE CANYON ROAD over SWEETWATER RIVER
Built 1995
Bridge Details
- Structure #
- 57C0714
- Year Built
- 2007
- Length
- 13.7 m (44.9 ft)
- Max Span
- 12.2 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 117
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.