INTERSTATE 8 EB over PEUTZ VALLEY RD

11-SD-008-R26.73 · County 073, California · Built 1969 · 3 Lanes · 17,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
57 0528R
Year Built
1969
Reconstructed
2002
Length
92 m (301.8 ft)
Max Span
30.8 m
Width
17 m (55.8 ft)
Lanes
3
Daily Traffic
17,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.