EL CAJON BLVD over MTDB LRT & SDIV RR
20FT E/O MURRAY DR · County 073, California · Built 1986 · 2 Lanes · 4,900 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.779453, -116.98605
This bridge is in worse condition than 65.2% of bridges in County 073. The average bridge in California is 0 years old; this one is 40 years old.
Nearby Bridges
MURRAY DRIVE over MTDB LRT & SDIV RR
Built 1988
GROSSMONT BLVD over INTERSTATE 8
Built 1990
INTERSTATE 8 over MTDB LRT & SDIV RR
Built 1961
E8-EL CAJON BL OFF over CHASE AVE
Built 1986
SEVERIN DR over INTERSTATE 8
Built 1989
MOUNT HELIX DR over MOUNT HELIX DR
Built 1934
W8-S125 CONNECTOR over I 8 & SR 125 & CONNS
Built 1989
E8-S125 CONNECTOR over LA MESA BL & S125-GRSMNT
Built 1990
GROSSMONT BL-N125 over N125-E8 CONNECTOR RAMP
Built 1993
W8-N125 CONNECTOR over N125-W8 & SEVERIN DR-W8
Built 1992
Bridge Details
- Structure #
- 57C0541
- Year Built
- 1986
- Length
- 68.3 m (224.1 ft)
- Max Span
- 30.5 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 4,900
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.