BONITA RD over SWEETWATER RIV TRIBUTARY

0.1MI S/O CENTRAL AVE · County 073, California · Built 1972 · 3 Lanes · 21,220 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
57C0498
Year Built
1972
Length
12.2 m (40 ft)
Max Span
3 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
21,220
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.