WOODMAN STREET over ROUTE 54
11-SD-054-4.21-NATC · County 073, California · Built 1996 · 4 Lanes · 9,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.673425, -117.039503
This bridge is in worse condition than 18.4% of bridges in County 073. The average bridge in California is 0 years old; this one is 30 years old.
Nearby Bridges
BRIARWOOD ROAD over STATE ROUTE 54
Built 1996
SWEETWATER ROAD over SWEETWATER RIVER TRIB.
Built 1974
CENTRAL AVENUE over SWEETWATER RIVER
Built 1997
BONITA RD over SWEETWATER RIV TRIBUTARY
Built 1972
WILLOW STREET over SWEETWATER RIVER
Built 2019
BONITA GLEN TERRAC over SWEETWATER RIV TRIBUTARY
Built 1972
REO DRIVE over ROUTE 54
Built 1993
BONITA ROAD over SWEETWATER RIVER
Built 1997
SWEETWATER RD over SWEETWATER RD STORM DRAN
Built 1985
CENTRAL AVENUE over SWEETWATER RIVER TRIB
Built 2008
Bridge Details
- Structure #
- 57 1002
- Year Built
- 1996
- Length
- 66.2 m (217.2 ft)
- Max Span
- 36.2 m
- Width
- 21.6 m (70.9 ft)
- Lanes
- 4
- Daily Traffic
- 9,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.