GENESEE AVE over INTERSTATE 5

11-SD-005-R29.46-SD · County 073, California · Built 2018 · 10 Lanes · 29,877 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 1224
Year Built
2018
Length
104.6 m (343.2 ft)
Max Span
54 m
Width
47.5 m (155.8 ft)
Lanes
10
Daily Traffic
29,877
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.