GILMAN DRIVE over INTERSTATE 5

11-SD-005-R28.70-SD · County 073, California · Built 2019 · 3 Lanes · 17,950 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 1084
Year Built
2019
Length
123.9 m (406.5 ft)
Max Span
52.3 m
Width
18.8 m (61.7 ft)
Lanes
3
Daily Traffic
17,950
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.