NB 125-WB 54 CONN over SWEETWATER RD

11-SD-125-8.97L · County 073, California · Built 2008 · 2 Lanes · 8,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
57 1178G
Year Built
2008
Length
62 m (203.4 ft)
Max Span
35.6 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
8,900
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.