STATE ROUTE 54 WB over SWEETWATER RD & W54-S125

11-SD-054-6.00 · County 073, California · Built 2007 · 3 Lanes · 64,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
57 1173L
Year Built
2007
Length
77.5 m (254.3 ft)
Max Span
40.2 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
64,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.