N125 TO E94 over SWEETWATER RD & BROADWAY

11-SD-125-13.22 · County 073, California · Built 2003 · 2 Lanes · 8,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 1060G
Year Built
2003
Length
650 m (2132.5 ft)
Max Span
80 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
8,750
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.